Complete industrial civil construction in Supa MIDC Phase 1, Phase 2, and Japanese Industrial Park. We execute pre-engineered steel buildings (PEB), high-load Trimix flooring, machine foundations, boundary walls, and plant expansions with clear structural engineering drawings.

Direct Desk AssistanceInstant quotation, site schedule, and documentation assistance for CIVIL / PEB CONSTRUCTION in Supa MIDC.
+91 9130090091
PEB Factory Sheds Trimix (VDF) Heavy Flooring Machine RCC Foundations Compound Walls & Gates
DIRECT DESK INTAKE

Inquire for CIVIL / PEB CONSTRUCTION

Submitting instantly connects you to our Supa MIDC desk (+91 9130090091) and logs a reference ticket.

Service Specifications
SPECIFICATIONS & CAPABILITIES

Detailed Operational Parameters

Everything included under our verified Supa MIDC single-window scope.

Quick Parameters

Clear Height
7m to 12m standard or custom
Flooring Load
5 MT to 15 MT/m² Trimix VDF
Steel Grade
High-tensile 345/350 MPa
Turnaround
BOQ & site inspection within 24 hrs
Area Coverage
Supa MIDC Phase 1, Phase 2, Japanese Park & Parner Road

Standard Scope of Delivery

01

Architectural & Structural Drawings

Complete structural design, GA drawings, and MIDC vetting-ready plans.

02

PEB Fabrication & Erection

Primary framing, secondary purlins, Galvalume sheeting, and turbo ventilators.

03

Heavy Duty Flooring

Vacuum dewatered (Trimix) industrial concrete flooring with hardener.

04

Civil Infrastructure

RCC plinth, drainage trenches, heavy machine pits, and perimeter compound wall.

SUPA-PARNER LOCAL ADVANTAGE

Direct On-Ground Execution Across Phase 1, Phase 2 & Japanese Zone

No third-party brokers. All CIVIL / PEB CONSTRUCTION inquiries are handled directly by our on-ground Supa MIDC desk with local administrative coordination, Sub-Registrar liaison, and 24x7 support.

Direct Desk Helpline+91 9130090091
Official TurnaroundSite visit in 24 hours • BOQ estimate in 48 hours
100% Privacy MaskedStrict masking for all properties & personal data
FAQ

Frequently Asked Questions

Clear, practical details for factory heads, project managers, and residents.

Do you handle MIDC plan approvals alongside construction?

Yes, our liaison desk coordinates structural drawings with MIDC Building Plan Approval & BCC so execution is 100% compliant.

Can you build custom heavy machine foundations?

Yes, we execute reinforced pits and vibration-isolated foundations for heavy presses, CNC gantries, and furnaces.

What is the standard delivery timeline for a 15,000 sq ft PEB shed?

Typically 60 to 75 days from foundation completion to final sheet erection.